JOBS.ac.kr
대한민국 최대 석·박사 채용 정보,
잡스!
잡스는 착한 광고 금액을 제공하고 있습니다. 광고문의로 신청해주세요.
banner_image
잡스는 당신의 연구 열정을 응원합니다! 석박사들을 위한 채용플랫폼을 경험하세요.
banner_image
“If we knew what it was we were doing, it would not be called research, would it?” - Albert Einstein
banner_image
잡스는 착한 광고 금액을 제공하고 있습니다. 광고문의로 신청해주세요.
banner_image
잡스는 당신의 연구 열정을 응원합니다! 석박사들을 위한 채용플랫폼을 경험하세요.
banner_image
채용공고
현재 26,097
대학정보
Virginia Commonwealth University

Boiler Operator/Stationary Engineer

등록일 : 2026-11-19
마감일
2027.01.18(월) 13:59D-60
기관유형
대학
학력
-
직군
직원
국가
미국
전공
근무지
Virginia
근무유형
풀타임
근무시간
12-hour shifts; 6am-6pm for 4 days, then 4 days off, then 6pm-6am for 4 nights, then 4 days off, then repeat; On-Call as required
급여액
$55,000 - $75,000
Organization Logo
기관명Virginia Commonwealth University
홈페이지https://www.vcu.edu
유형대학

Department: Engineering and Utilities

Join VCU Facilities Management as a Boiler Operator/Stationary Engineer in VCU's Steam Plant.

The Boiler Operator/Stationary Engineer is responsible for operation of MCV and MPC steam plants and distribution systems, ensuring that each plant operates reliably, efficiently, and at all times in compliance with safety and environmental regulations.

What You'll Do

  • Control boilers and other mechanical equipment to provide utilities for Hospital, Academic, and State buildings
  • Ensure long equipment life, operating efficiency, and equipment availability by following accepted procedures
  • Use solid inspection techniques to detect and correct problems at an early stage to avoid costly problems later
  • Utilize troubleshooting skills to remedy malfunctions and return equipment to full functionality in minimum time
  • Work 12-hour (6 to 6) day and night rotational shifts as assigned, including weekends and overtime where required; work during inclement weather
  • Rotating Shift Schedule is as follows:
    • 6am-6pm for 4 days, then 4 days off, then 6pm-6am for 4 nights, then 4 days off, then repeat
    • Results in approximately 15 days off each month and 24 hours of built in overtime bi-monthly
  • At times, work other than normal shifts; 24-hour rotational on-call status is required
  • Make minor repairs and perform preventive maintenance tasks as needed
  • Follow safety procedures to guard against burns, electric shock, noise, dangerous moving parts, and hazardous exposures
  • Interface with customers ensuring needs are met should problems arise
  • Demonstrate competency through formally recognized professional licensing program

Responsibilities include (but arenot limited to):

Steam Plant Operations

  • Conduct routine and emergency boiler startups and shutdowns, ensuring remaining online boilers can carry the steam load before shutting down
  • During ongoing operations, verify equipment is operating safely, efficiently, and within the boundaries of regulatory permits
  • Check condition of accessory equipment and interlocks used to start, stop, and operate boilers such as pressure controls, fuel trains, and water supply pumps
  • Follow emergency procedures to reduce the possibility of injuries or damage to equipment

Steam Plant Maintenance

  • Use hand and power tools to perform basic maintenance
  • Perform routine preventive maintenance. Lubricate moving parts, replace filters, and remove corrosion that makes equipment less efficient
  • Test and perform basic maintenance on boilers and accessories using proper procedures

Steam Plant Safety

  • Follow proper safety procedures at all times. Practice safety habits that reduce the possibility of personal injury, injury to others, and damage to equipment
  • Understanding of all potential hazards and the safety systems that provide protection
  • Conduct routine safety checks, identifying and correcting issues. Scrutinize the facility and equipment carefully without making assumptions about existing conditions

Training

  • Train on-the-job under the supervision of experienced boiler operators
  • OJT may be supplemented by courses at trade, vocational, or technical schools
  • Monitor various parameters in the boiler plant. After demonstrated competence, move on to more complicated tasks. Use each task to refine knowledge and skills
  • Update skills in the profession regularly, especially when new equipment is introduced

Qualifications:

Minimum Qualifications

  • High School diploma, GED, or equivalent
  • General maintenance knowledge or experience in steam or industrial settings
  • General computer skills
  • Familiarity with basic safety and environmental rules / procedures
  • Good interpersonal communication, role model, operational, and professional excellence skills
  • Valid Virginia Driver's License required
  • Demonstrated ability to work in and foster an environment of respect, professionalism and civility with a population of faculty, staff, and students from all backgrounds and experiences, or a commitment to do so as a staff member at VCU

Preferred Qualifications

  • 1-3 years knowledge and experience in steam boiler or industrial steam plants
  • Licensed Stationary Engineering, Power Plant, Facility Plant, or Boiler operator
  • Engineering, Military, or combined experience
  • Experience in University, Boiler Plant, Power Plant, or Central District Heating systems
  • Interest in learning highly technical subjects along with a willingness to keep learning
  • Previous mechanical and/or technical experience
  • Strong technical abilities for analyzing and working on various systems
  • Strong communication skills to collaborate with colleagues and interact with clients

Salary Range: $55,000 - $75,000

Benefits: All full-time university staff are eligible for VCU’s robust benefits package that includes comprehensive health benefits, paid annual and holiday leave, generous tuition benefits, retirement planning and savings options, tax-deferred annuity and cash match programs, employee discounts, well-being resources, abundant opportunities for career development and advancement, and more.

FLSA Exemption Status: Non-Exempt

Work Days/Hours: 12-hour shifts; 6am-6pm for 4 days, then 4 days off, then 6pm-6am for 4 nights, then 4 days off, then repeat; On-Call as required

Hours per Week: 40

Restricted Position: No

ORP Eligible: No

Flexible Work Arrangement: Fully Onsite

University Job Title: 17092N - Boiler Operator/Stationary Engineer FM 2

접수정보

접수정보는 로그인 후 열람 가능합니다.
채용마감까지 남은 시간
등록일
|
2026-11-19
마감일
|
2027-01-18
・
잡스는 오픈된 공고를 기반으로 채용정보를 안내합니다. 정확한 사항은 해당기관에 반드시 직접 문의해 주시기 바랍니다.
・
본 사이트에서 제공하는 정보의 무단 복사 및 배포는 저작권법에 위배될 수 있습니다.
대한민국 최대 석·박사 채용정보, 잡스!
광고문의

맞춤 공고

제목
직군
기관
마감일
남은기간
등록일
맞춤공고가 없습니다.
최근 본 공고
로그인 후
사용 가능합니다
TOP
BOTTOM
고객센터 : 02-307-0109 (평일 : 09:30 ~ 18:30 / 주말, 공휴일 : 휴무)
이메일 : info@jobs.ac.kr
잡스(유), JOBS LLC.
주소 : 서울특별시 동대문구 왕산로36길 6
대표자 : 李鴻慈
사업자등록번호 : 209-87-01698
직업정보제공사업 : 서울동부 제2020-7호
JOBS.ac.kr is launched and operated in Konkuk University.
© JOBS LLC. All rights reserved.